ADVERTISEMENT

ADVERTISEMENT

Signal replacement begins on U.S. Highway 2 in Cass Lake

Motorists will encounter a four-way stop at the intersection of U.S. Highway 2 and Grant Utley Avenue in Cass Lake, beginning today, Sept. 16, as crews replace the traffic signals at that location.

Motorists will encounter a four-way stop at the intersection of U.S. Highway 2 and Grant Utley Avenue in Cass Lake, beginning today, Sept. 16, as crews replace the traffic signals at that location.

The four-way stop will be in place until the new signal is operational, which is expected to be in the afternoon on Friday, Sept. 18.

Motorists are asked to use extreme caution and be alert to slowing and stopping traffic.

For statewide information on road conditions and construction visit the Web site 511.mn.org or call 511.

What To Read Next
Mike Clemens, a farmer from Wimbledon, North Dakota, was literally (and figuratively) “blown away,” when his equipment shed collapsed under a snow load.
Wanda Patsche, new Farm Camp director, has farmed with her husband near I-90 in southern Minnesota since the 1970s and shares her passion for farming on her blog.
The University of Minnesota has been researching the effects of dough fermentation and wheat variety in creating bread that is easier to digest.