ADVERTISEMENT

ADVERTISEMENT

Birchmont Drive Project begins

Bituminous milling is scheduled to begin today in three locations along Birchmont Drive Northeast. The first location is from approximately 3407 Birchmont Drive N.E. to the intersection with 29th Street Northeast. The second location is from the ...

Bituminous milling is scheduled to begin today in three locations along Birchmont Drive Northeast.

The first location is from approximately 3407 Birchmont Drive N.E. to the intersection with 29th Street Northeast. The second location is from the intersection of Annebell Street Northeast to approximately 4505 Birchmont Drive N.E. The third location is from the intersection of White Pine Street Northeast and Birchmont Drive Northeast to approximately 5204 Birchmont Drive N.E.

The bituminous milling will result in lane closures. However, the road will be open to local traffic. Motorists are urged to exercise caution when passing through these areas.

Birchmont Drive is now closed to through traffic for the summer.

For more details about the Birchmont Drive Project, call Bob Moe at 759-9218.

ADVERTISEMENT

Construction updates can also be viewed at www.freeberggrund.com .

What To Read Next
Fundraising is underway to move the giant ball of twine from the Highland, Wisconsin, home of creator James Frank Kotera, who died last month at age 75, 44 years after starting the big ball.
Mike Clemens, a farmer from Wimbledon, North Dakota, was literally (and figuratively) “blown away,” when his equipment shed collapsed under a snow load.