Sections

Weather Forecast

Close
Advertisement

U.S. Highway 2 getting median cable barrier

Email Sign up for Breaking News Alerts
news Bemidji, 56619
Bemidji Minnesota P.O. Box 455 56619

A project to install high tension cable barrier in median sections of U.S. Highway 2 in Bemidji began this week.

The median cable barrier will be installed in intermittent locations from the east junction with state Highway 89 to the exit ramp of U.S. Highway 2 and U.S. Highway 71 South, according to a press release from the Minnesota Department of Transportation.

Advertisement
Advertisement

The protective barriers are being installed as safety measures in the event of a vehicle crossover crash between divided highways.

MnDOT stressed that motorists should slow down and be alert to workers and equipment moving in and out of the highway median.

The cable barrier project is expected to be completed by Sept. 25, weather permitting.

For information on state road conditions and construction, visit www.511mn.org or call 511.

Advertisement
Advertisement
Advertisement