Sections

Weather Forecast

Close
Advertisement

St. Croix bridge project speeded up

STILLWATER, Minn. -- The Minnesota and Wisconsin departments of transportation announced they are accelerating the St. Croix Bridge project by starting construction on the river piers for the bridge foundation in 2013.
The $50 million contract will open for bids in late-winter 2013. Construction is anticipated to begin on the bridge foundations in late-spring 2013. Previously, construction was planned to begin in spring 2014.
The St. Croix Crossing project replaces the 80-year-old Stillwater Lift Bridge with a safer, more reliable four-lane bridge that will connect expressways on both sides of the St. Croix River in Stillwater and Oak Park Heights, Minn. and St. Joseph, Wis.
The project adds extensive trail systems, including converting the Stillwater Lift Bridge to a bicycle and pedestrian crossing, and highway construction on each side of the river.
The four-lane St. Croix Crossing Bridge is estimated to cost between $280 million and $310 million. The total cost for the entire St. Croix Crossing project is estimated to cost between $580 million and $676 million.

Advertisement
Advertisement

Similar Articles

ST. PAUL, Minn. (AP) — Traffic safety officials say Minnesota last year saw its first increase in traffic deaths since 2007. The final crash report shows Minnesota had 395 traffic ...

WALKER – A Bemidji man injured in a Saturday crash near here has died. The Minnesota State Patrol reported on its website the driver who lost control of his car ...

MINNEAPOLIS (AP) — At least three of the five people who survived an interstate crash that killed three others in Minneapolis are in critical condition. The eight were in a ...

LAPORTE - Travel speeds are reduced east of Laporte due to spring flooding. Highway 200, between Hubbard County roads 45 and 30, is marked with flashers. Also posted is a ...

Advertisement

More from around the web:

Advertisement