Sections

Weather Forecast

Close
Advertisement

Highway 10 bridge to reopen soon

Email Sign up for Breaking News Alerts
News Bemidji,Minnesota 56619 http://www.bemidjipioneer.com/sites/all/themes/bemidjipioneer_theme/images/social_default_image.png
Bemidji Pioneer
Highway 10 bridge to reopen soon
Bemidji Minnesota P.O. Box 455 56619

BAXTER, Minn. -- The U.S. Highway 10 bridge over the Mississippi River at the Little Falls bypass is scheduled to open to traffic on or before Saturday, March 27.

Advertisement

Crews are currently building temporary traffic crossovers on each end of the bridge and stabilizing the westbound lanes to allow traffic on the westbound lanes of the bridge.

Eastbound lanes will remain closed.

Traffic will be restricted to a single lane in each direction on the westbound lanes over the bridge.

The bridge was closed to traffic on Wednesday, March 17, due to damage from an ice jam in the main channel and erosion to the overflow bridge.

Advertisement
Pioneer staff reports
Advertisement
Advertisement
randomness